-
Posts
9,031 -
Joined
-
Last visited
Content Type
Profiles
Forums
Downloads
Gallery
Store
Everything posted by Rsquared
-
Welcome aboard from Maryland.
-
Well it's been a good run. All good things...................
-
Got my gubment relief check, Woo Hooo...
Rsquared replied to Albroswift's topic in General Discussion
AH HAAAAA! I got you beat fuker. I got a whopping 69 bucks from our rich uncle. I called the bank and asked if I could get it in 1's. Time to go "clubbin" and "make it rain" in hyere. Though, realistically, I wasn't really expecting much. After all.....some of us actually have to try and help pay for all of this bull$hit. -
Yep. The flaming pig. This is a 7.5" Noveske barrel, with the KX-3 on it. Used a Wilson Combat rail on it. I built this for an SBR. She doesn't kick bad at all.
-
Now all I was doin was sittin over here minding my own business. Next thing you know? I'm getting whacked in the back of the head with a 2x4, the black hood pulled over my head and then getting thrown into the back of a van. It ain't easy being me at times.
-
Welcome aboard from Maryland.
-
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
I can always change the garage door sound ya know. M16 Assault Rifle-SoundBible.com-545800860.mp3 -
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
Go ahead and laugh fuker. Wait until I help you wire up your house when you're ready to build it. You'll never know where all the sounds are coming from. I'll leave little "easter-egg" sound FX all over that fukin place. OH.....don't turn the disposal on. NO....don't open the refrigerator door. AHHHHH.....don't ever hit that light switch. You'll open your garage door to leave in the morning and hear......... torpedo.wav And it'll send you diving into the bushes. Okay.....maybe I just make myself laugh sometimes. -
You nailed it my good man. Good eye. If one pays attention, all off the tie wraps (insert name here) are at all at the junctions of the wire trough. Logically where you're about to turn and send the wire off into a 90 degree turn. It just helps hold everything in place while you're working on it.....as you know. And yes.....all of the heads are facing the same direction on purpose. And oh HELL yes! All of them are snapped off cleanly. Nothing worse than cutting and gashing yourself with your own $hit.
-
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
Really? Don't we all know what kind of sound it would make? REDALERT.WAV -
Welcome from Maryland.
-
-
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
-
Ha. Yeah...I'm into it. Uh-oh Agreed. This could get serious.
-
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
You mean that you need permits? No, not yet. Though it would be a simple thing to do. But, the home automation controller that I'm currently using is quite old (almost 20 years). And the comm port that is used to access it's programming is roached at this point. So I can't change or alter any of it's programming. I'm considering changing it out to one of the styles like I use at work. But I'm just letting it limp along for now. Other projects take precedence over replacing that. That is, unless it goes tits up on me. Then the change will be mandatory. I can't go back to actually flipping light switches on or off throughout the house, or manually changing thermostat settings after all of these years. That would be like living in the stone age again. There was definitely hydration involved. -
Who doesn't love a good sparring round my brother?
-
Easy. Almost no process there. I HATE cleaning guns. Smartass!
-
So a couple of our other guys and I have been working at the NOAA home offices in Silver Spring Maryland for the last couple of months. We've been doing pretty much a ground up Re-Fit on the control systems for their central plant in one of their four buildings that they have here. Just like the other building that we did for them last year, they got all new chillers, pumps, cooling towers, freq drives and control valves. It always makes me laugh a little. Because, being a Re-Fit on a live, functioning system. You kind of have to attack these things in a caveman type of way. They have to stay somewhat functional, but yet you still have to rip everything out and replace it with new, modern equipment. Meaning, at some point, the place looks like an ABSOLUTE train wreck, with $hit running or dangling everywhere as you try to overlay the new stuff in place of the old. I could go on for days about this process, but I won't kill you guys with all the mundane details. I'm just rambling anyway. So I'll just show a little of what we had to deal with, and what we're about to walk away from as a finished product. First of all.....what we had to start with. Yep....pretty fugly huh? No reason for a control system running a chiller plant to EVER look like this. Obviously, this was after we had ripped the old panel down, cut in a trough for all conduits coming into the new panel, and custom building the new panel. I was probably about half way through the new wiring of the panel at this time, with just some baseline programming running some pumps. More wiring done. Stuff starting to come together. All wiring done at this point. Covers in place to help "clean" it up. Software maybe about 2/3 (ish). Just about everything buttoned up. Still tweaking software at this point. This plant has 23 line voltage (120 volt) 2 position valves. So we had to custom build a relay panel to control them. This is basically getting the panel layed out on the inside, in preparation for the relays and wiring. Installing the relays and getting them pre-wired for their incoming power source. Landing all of the power and control wiring. Pretty much finished. Just need to hang the laminated legend on the inside of the door, and then pop all of the cable ties that were holding back the wire before the covers were put on. You guys can probably see why I'm so anal with my own projects that I do at home now.
-
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
Yeah, yeah I know......silly but somewhat useful at times right? -
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
Actually, I do have my "first class operating engineer" license, for what that's worth. It usually just means that somebody passed a test though. God forbid you put a wrench or screwdriver in their hands though. A lot of those guys would be lost. -
$hit that I do "in between" all the other projects at my place
Rsquared replied to Rsquared's topic in Club House
I knew that you'd like that. And I agree. I HATE the way guys do residential electrical $hit. You can never "trust" the joker that was before you. AND....I was tempted to run either greenfield or liquid-tight from the panel to the appliances. But I had to contain myself. -
Welcome from Maryland.
-
Welcome from Maryland.
-
Welcome from Maryland.









